Skip To Main Content

New Long-Range Facility Plan

NKC Schools' new Long-Range Facility Plan incorporates input and thinking from thousands of district students, parents and guardians, staff members and our overall community together with updated building assessments and demographic data. This roadmap represents our commitment to creating learning environments in which we all can take great pride. The Long-Range Facility Plan charts a course for the years ahead that expands opportunities for all students at every stage of their educational journey. 

The 25+ projects outlined in the plan are grouped into three phases spread over several years. View the full November 25, 2024 Board presentation here. A summary of phase one projects, plus an outline of plans for phases two and three, is below. An adjustment to the plan was Board-approved on October 28, 2025; view the presentation here.

Phase One Projects

Oak Park students perform in Hairspray musical on stage

Oak Park High School Performing Arts Center

A new performing arts addition to Oak Park will expand opportunities for students in several areas, including theater, choir, band, orchestra, and more. The new PAC will also serve as a hub for Oak Park feeder pattern events, providing a common space that welcomes all future Northmen. 

Exterior photo of front entry at New Mark Middle School at sunrise

Major Renovations at New Mark Middle School

Extensive renovations will benefit students New Mark, including the addition of a new gym and high-wind shelter to provide additional safety and space for students and community use. A renovated library space will also welcome students, along with additional flexible space for specialized programming. New Mark will also see extensive flooring, paint and lighting updates.

Winnetonka students take a final bow after performance of 9 to 5 the musical

Winnetonka High School Performing Arts Center

Winnetonka will be home to a new performing arts center, bringing new and increased opportunities for all students. This modern space will support programs like theater, choir, band, and orchestra. The new space will also become a gathering place for the Tonka feeder pattern, offering a shared space to connect and celebrate future Griffins.

group of students stand in front of school front entrance

Major Renovations at Antioch Middle School

Updated October 28, 2025

Significant renovations at Antioch will will update the building to better serve today's students. A gymnasium addition will add space and provide a high-wind shelter in the event of severe weather. Redesigned spaces, particularly for arts and activities, will help students better grow and utilize the spaces available to support their learning. 
 

Exterior photo of Oakwood Manor Elementary School on an overcast day

Addition at Oakwood Manor Elementary School

Say goodbye to the "gym-eteria" – a brand-new gymnasium addition to Oakwood Manor will replace the existing dual-purpose space that serves as both gym and cafeteria! It will also provide a high-wind shelter in the event of severe weather. In addition, updates to finishes throughout the school will ensure Oakwood Manor is ready to serve generations of students to come. 

Photo of maintenance workers looking into a tunnel being dug for pipe

Maintenance & More

Several smaller projects will round out phase one, including maintenance, rooftop A/C units, and new outdoor equipment storage facilities at many sites throughout the district. NKC Schools also intends to purchase the Northland Innovation Center located in Gladstone outright, providing a more fiscally effective use of funds than the current lease agreement and additional space for district programming.
 

Phase Two

The second phase of our new Long-Range Facilities Plan outlines the next group of sites slated for proposed improvements. The schools and projects outlined below were identified based on feedback from our community and onsite facility assessments.

Phase 2
  • Northgate Middle School: Full Replacement Building (updated October 28, 2025)
  • Maple Park Middle School: Renovations & Outdoor Facility Additions
  • Middle School Athletic Facilities (Antioch, Maple Park, New Mark, Northgate)
  • Solutions for Clardy Elementary & Gashland Elementary
  • Gracemor Elementary School
  • Maintenance & Rooftop Units

Phase Three

Planning for growth, needs and projects out for nearly a decade from now can be challenging in a district our size. The third phase of our Long-Range Facilities Plan is designed to be more fluid and flexible. We will continue to monitor facilities and seek feedback as we progress toward this stage to best prioritize the needs at several sites. Those sites on the horizon for consideration in different components of phase three include:

Phase 3a
  • Gateway 6th Grade Center
  • Eastgate 6th Grade Center
  • Winnetonka High School Classrooms
Phase 3b
  • Meadowbrook Elementary
  • Topping Elementary
  • Ravenwood Elementary
  • Bell Prairie Elementary
  • Fox Hill Elementary
  • West Englewood Elementary
  • Joe Jacobs Education Center
  • Golden Oaks Education Center
  • Maintenance & Rooftop Units

Note: Planned projects, scopes and timelines may be adjusted over time due to circumstances beyond NKC Schools' control, such as economic conditions or weather.

 

Back to Facility Planning